For account approval and general support, email migi@paidforumposting.com or go to https://discord.gg/HtwZ9YD

ENGINEERED GRAVEL ROAD CONSTRUCTION


INNOCENT TIBENDA

Recommended Posts

design steps of grave roads.

  • estimation of traffic, here only heavy vehicles exceeding 3 tonnes  are counted we call them commercial vehicles and the remaining vehicles less than 3 tonnes you will not count them.and finally cummulative equivalent  standard  axle load is determine for all design period  of the pavement.
  • evaluation of the sugrade strength, you do sampling along the road and do soil tests including CBR test, atterberg limit test and then you detect the problem soil that needs special treatments and then pick the CBR class from the design manual.
  • select the material types and pavement thickness by guide of the design manual.

ANY QUESTION YOU MAY ASIK.

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.